Recycling & Material Recovery

Evaluate distinct routes for recycled aggregates and recovery from tailings streams.

Start with the raw material and the size fractions you need.

Mobile equipment for processing duties
Mobile equipment for processing duties

Choose the recovery objective

Construction-waste recycling and tailings recovery involve different feeds and process conditions. Start by describing the incoming material and the product you intend to recover.

Recycled aggregates

For construction and demolition material, review sorting, unwanted-material removal, crushing, metal removal and screening. Feed composition and product acceptance requirements determine the useful scope. Mobility is a separate decision based on relocation and site conditions.

Tailings and fine material

For tailings, assess particle sizes, solids concentration and the recovery target. Classification, fine recovery, dewatering and sludge handling may form different branches of the process. Residual-mineral recovery requires its own sample evidence.

What to send

Include a feed description, representative photographs or test data, target outputs, quantity or flow, existing equipment and the routes available for water and rejected material.

Related equipment and materials

Tell us what you need to process.

Start with the material and the product you want to make. We can review the equipment scope with you.

  • Feed material
  • Target output
  • Required capacity
  • Site conditions